As a child I used to enjoy visiting my Grandmother, or Nan as we always called her, and one of the reasons was that if you were lucky you got to see the wood barges being hauled up the canal to the wood yard. She lived in St. Georges Way, North Peckham and to get there we had to cross Willowbrook Bridge over the canal. If you’re familiar with the area you will know the bridge at the bottom of Peckham Hill Street, It’s just one of the many in the area including Commercial Way, Trafalgar Avenue and Old Kent Road to name but a few on the main roads. Now no longer do they straddle the Canal instead they bridge the “Green Tongue”, an extension of Burgess Park.
I didn’t know it then but “the Canal”, as we called it was properly called the Grand Surrey Canal. Later when I came to know that the canal was called the “Surrey Canal” I was surprised as it only went as far as Wells Way and that even when my mother was a child it only went to the Camberwell Road.
So what went wrong, why did the “Surrey Canal” never get to Surrey?
The Grand Surrey Canal Act passed in 1801 authorised the canal from Rotherhithe to Epsom, but even before the canal was built the company started making plans for an enlarged ship dock at its entrance. This soon began to take priority over the canal.
The company, trying to deliver both canal and dock at the same time, ran into financial problems and for a while work stopped on them both. The dock, or basin, opened first, on 13th March 1807. There is a famous picture of the canal in which it all looks idyllic a nice sailing barge moored up with St Georges Waterloo Church in the background, very different from the area as I knew it.
The Croydon Canal, which was being built at the same time, depended on the Grand Surrey for its connection with the Thames. So the directors of the Croydon Canal Company were peeved and applied pressure for the “Surrey Canal” to be completed as least as far as their junction.
This did happen but the relationship between the two companies was never as good as it might have been, with the Grand Surrey company focusing most on its dock operation. The Grand Surrey was opened as far as Camberwell Road in 1809 but was never built any further. A 1,100 yard, (1000m) arm serving Peckham was also opened in 1826, this stopped just short of Peckham High Street to where it was connected by a short piece of road called Canal Head. This has in recent times been redeveloped as “Peckham Square”.
In the 1940s the section from Wells Way to Camberwell Road was closed and in 1970 when the dock was closed the Canal was drained. (In fact it survivedlonger than most of the Croydon Canal, which was filled in much earlier to form the track bed for the South London rail link from London Bridge to Croydon through Sydenham. Where there exists an unusual type of bridge to be crossing over a railway but which can be seen as a typical canal bridge from an earlier period once one knows the history.) Another use for the northern section of the canal is the new “Surrey Canal Road” and “Canal Approach” which uses part of the filled in canal from Ilderton Road to Evelyn Road.
I remember looking over Trafalgar Bridge and Willowbrook Bridges into the junk that had been tossed in over the years when it was drained – the end of an era. Of course the barges had gone, as was the need to cross the bridges when my Nan moved to a new flat when the North Peckham estate was being built. However when I occasionally drive over one of these bridges all those memories come back, a lost part of Peckham.
Laurie Smith
We work and travel around London; and as we do, pass interesting places. Waiting at Sloane Square tube station you look up and see the huge pipe that carries the River Westbourne, We walk along The Strand, many of us little guessing that the name comes from the Old English word for "beach" To look again at our surroundings and add interest to these travels is why I decided to write this blog. Enjoy and add some feedback please.
Sunday, 30 November 2003
Sunday, 31 August 2003
Hungerford Bridge
I first heard of Hungerford Bridge from a teacher at school who was teaching us about the order of bridges up the Thames from Tower Bridge to somewhere like Hammersmith. He told us about Hungerford Bridge and the idea of a railway bridge that you could walk over intrigued me. In later years it also intrigued me that the bridge had a name, Blackfriars, Cannon St and Victoria Rail Bridges do not so why would Charing Cross?

When I later learned that there had been previously been a footbridge on the site it became obvious that the footbridge stuck on the side of the railway was part of the price for putting the rail bridge across the river that the railway company had to pay.
Years passed and I started work for Post Office Telecoms and, working in the area, came to know the bridge quite well. Walking over it and on the embankment nearby I noticed something odd, the Bridge has two large brick piers and several steel supports, why not all the same? It was as though the bridge had been built at different times. In fact it had.
In 1845, the Hungerford Bridge was opened as a footbridge for pedestrians walking from Charing Cross on the north bank of the River Thames to Lambeth on the south bank. Isambard Kingdom Brunel designed the bridge, not unlike his Clifton Bridge in appearance, in 1841. It was
commissioned to encourage trade at the new Hungerford Market. Two 80ft-high brick piers, built in the river to an Italianate campanile style, carried the bridge platform 1,352ft across the Thames, suspended from four iron suspension chains.
The Illustrated London News observed that pedestrians could ‘walk through the centre of the fruit stalls, over the fish market, and in a few minutes find themselves in Pedlar’s Acre, Lambeth’. Later when the Charing Cross Railway wanted to replace the pedestrian suspension bridge with a rail bridge, the company argued that few people used the Hungerford Bridge due to the smell from the river, especially during the summer.
The Hungerford Bridge was closed in 1861, and replaced in 1864 with the Charing Cross Railway Bridge, a nine-span wrought iron bridge that carried Railway passengers to the new West End terminus at Charing Cross. The two central piers that suspended the Hungerford Bridge were however incorporated into the new bridge and remain to this day. I had been right to suspect the different material used in construction. Obviously the railway required more support than the footbridge, but the canny Victorian railway magnets didn’t want to waste the cost of replacing the perfectly strong piers that Brunel had built only twenty years before.
Brunel, equally crafty however, used the chains of the original bridge which he obtained at a knockdown price to complete a new suspension bridge in Clifton. The chains from the Clifton Suspension Bridge had been sold to the Cornwall Railway Company in 1853 when the Clifton scheme ran into financial difficulties. The Hungerford Bridge chains were acquired as a replacement for the paltry price of £5,000.
Today you can now cross the river on two new bridges either side of the old rail bridge which allows you a better view of the Brunel piers than you could get when walking over them or riding a train into the station and interestingly, and ironically, they are now being cleaned and repaired!
Hungerford Market is long gone buried under Charing Cross Station. Though once upon a time that same schoolteacher had taken me around a collector's market under the arches there. On the Lambeth side, beyond the South Bank complex and Jubilee Gardens, containing the London Eye, is Belvedere Road, the area once known as Pedlar’s Acre.
You see tourists taking pictures of the new bridges and of London Eye from it. People say “Isn’t it great to have the upstream view of the Houses of Parliament now”. Whereas me, I feel it’s a shame we lost the beautiful Brunel bridge for the ugly railway crossing. Even though I often use Charing Cross station I think “Couldn’t they have put it somewhere else?”
Laurie Smith

When I later learned that there had been previously been a footbridge on the site it became obvious that the footbridge stuck on the side of the railway was part of the price for putting the rail bridge across the river that the railway company had to pay.
Years passed and I started work for Post Office Telecoms and, working in the area, came to know the bridge quite well. Walking over it and on the embankment nearby I noticed something odd, the Bridge has two large brick piers and several steel supports, why not all the same? It was as though the bridge had been built at different times. In fact it had.
In 1845, the Hungerford Bridge was opened as a footbridge for pedestrians walking from Charing Cross on the north bank of the River Thames to Lambeth on the south bank. Isambard Kingdom Brunel designed the bridge, not unlike his Clifton Bridge in appearance, in 1841. It was
commissioned to encourage trade at the new Hungerford Market. Two 80ft-high brick piers, built in the river to an Italianate campanile style, carried the bridge platform 1,352ft across the Thames, suspended from four iron suspension chains.The Illustrated London News observed that pedestrians could ‘walk through the centre of the fruit stalls, over the fish market, and in a few minutes find themselves in Pedlar’s Acre, Lambeth’. Later when the Charing Cross Railway wanted to replace the pedestrian suspension bridge with a rail bridge, the company argued that few people used the Hungerford Bridge due to the smell from the river, especially during the summer.
The Hungerford Bridge was closed in 1861, and replaced in 1864 with the Charing Cross Railway Bridge, a nine-span wrought iron bridge that carried Railway passengers to the new West End terminus at Charing Cross. The two central piers that suspended the Hungerford Bridge were however incorporated into the new bridge and remain to this day. I had been right to suspect the different material used in construction. Obviously the railway required more support than the footbridge, but the canny Victorian railway magnets didn’t want to waste the cost of replacing the perfectly strong piers that Brunel had built only twenty years before.
Brunel, equally crafty however, used the chains of the original bridge which he obtained at a knockdown price to complete a new suspension bridge in Clifton. The chains from the Clifton Suspension Bridge had been sold to the Cornwall Railway Company in 1853 when the Clifton scheme ran into financial difficulties. The Hungerford Bridge chains were acquired as a replacement for the paltry price of £5,000.
Today you can now cross the river on two new bridges either side of the old rail bridge which allows you a better view of the Brunel piers than you could get when walking over them or riding a train into the station and interestingly, and ironically, they are now being cleaned and repaired!
Hungerford Market is long gone buried under Charing Cross Station. Though once upon a time that same schoolteacher had taken me around a collector's market under the arches there. On the Lambeth side, beyond the South Bank complex and Jubilee Gardens, containing the London Eye, is Belvedere Road, the area once known as Pedlar’s Acre.
You see tourists taking pictures of the new bridges and of London Eye from it. People say “Isn’t it great to have the upstream view of the Houses of Parliament now”. Whereas me, I feel it’s a shame we lost the beautiful Brunel bridge for the ugly railway crossing. Even though I often use Charing Cross station I think “Couldn’t they have put it somewhere else?”
Laurie Smith
Subscribe to:
Posts (Atom)